New era of growth and development at Milan Bergamo Airport

Milan Bergamo Airport is undergoing significant infrastructure enhancements to improve the travel experience and boost operational efficiency. These upgrades, focused on both commercial and business aviation, are set to strengthen the airport’s position as an important hub in Northern Italy.
One of the main projects is the airport’s multi-phase terminal expansion. The first phase of the expansion involves enlarging the check-in hall, nearly doubling its current capacity. By increasing the number of check-in counters from 33 to 60, the airport hopes to reduce wait times and streamline passenger flow. This part of the project is expected to be completed during the second quarter of 2025.
The second phase, scheduled for completion by late 2025, focuses on creating a new security control area. Located on the first floor of the expanded terminal, this new section will feature the latest security technologies, including dedicated family lanes and fast-track options for passengers in a hurry. Additionally, the airport plans to open two new non-Schengen gates in early 2026 to accommodate international flights, while the current gate system, which includes 15 Schengen and 10 non-Schengen gates, will be optimised. An extra Schengen gate will also be added by early 2025 to cater to the growing number of travellers.
Milan Bergamo Airport is also improving accessibility through a series of transportation upgrades. In the summer of 2024, the airport opened a new P1 East parking area to provide a more efficient pick-up and drop-off experience for passengers. Soon, a new vehicle entrance will be introduced, further enhancing traffic flow and ease of access to the airport.
One of the most anticipated developments is the upcoming train connection to Bergamo, Milan, Monza, and Lecco, which is scheduled to become operational in the second half of 2026. This direct rail link will provide fast and convenient access to the airport, particularly for passengers traveling to popular tourist destinations like Lake Como. A dedicated underground tunnel that will connect the terminal to the future train station is already complete, laying the groundwork for smoother airport connectivity.
The north area of the terminal has also seen significant upgrades. The completion of the north apron expansion, featuring 14 new C-class stands and a new taxiway B, will enhance the airport’s operational capacity and flexibility. In early 2025, new general aviation facilities will become available, including a dedicated security and customs area separated from commercial passenger traffic. These facilities will also include food and beverage outlets and separate road access, offering a more private and convenient experience for business travellers.
In an effort to enhance passenger convenience, plans are underway to build a new airport hotel in the P3 parking area. The hotel, to be managed by an international brand, will cater to travelers seeking easy access to accommodation. Construction is expected to begin soon, adding another layer of comfort for passengers.




