New Route of the Day – Americas (7 March 2025): Avelo Airlines between New Haven and Dallas DFW

Avelo Airlines introduced flights between New Haven and Dallas DFW on Friday 7 March. The 2,330-kilometre service will operate 2-weekly, on Mondays and Fridays, with the 737-800 aircraft. The LCC has no competition on the route.
Flight XP330 departs New Haven at 14:15 local time, arriving at Dallas DFW at 17:10 local time. The return service, operating as flight XP331, takes off from Fort Worth at 17:55 local time, touching back down in Connecticut at 22:19 local time.
What they said
Andrew Levy, Founder and CEO of Avelo Airlines, said: “We are thrilled to launch service from southern Connecticut to Avelo’s second destination in Texas: Dallas-Fort Worth. The strong demand for our service between New Haven and Houston has been incredibly motivating, and we’re excited to offer this second popular destination in the Lone Star State. There has never been a more affordable, convenient, and reliable way for southern Connecticut travellers to experience the best of Texas. At the same time, this new service makes it easier than ever for Texans to explore all that Connecticut has to offer.”
Avelo now serves 30 destinations from New Haven
Dallas DFW becomes the 30th destination to be served by Avelo Airlines from New Haven. The carrier maintains operations from Tweed Airport to 12 US states and Puerto Rico. It will further expand its network from the city by launching flights to Detroit on 4 April and Portland on 22 May.
Avelo Airlines introduced services from New Haven in 2021 and has since become its largest carrier. However, it is facing increased competition from Breeze Airways, which launched operations from the airport in December 2024 and has commenced a number of routes.
New Haven had no commercial flights until five years ago but will boast up to 26-daily flights during the upcoming summer season.
New Haven to get new terminal
In October 2024, New Haven Airport secured a four million US dollar grant to support the construction of a new terminal on its east side. Once completed, the modern six-gate terminal will replace the existing facility on the west side, which dates back to 1931.
As part of this long-anticipated expansion project, the airport’s runway will also be extended. Additional funding for the runway expansion was obtained in February 2024 when the airport received a two million US dollar grant.




